Case Study

Menzieshill Community Centre

Situated in the Lochee area of Dundee, the Menzieshill Community Hub opened in October 2019 and replaced Menzieshill Community Centre and Library providing modern facilities including: 2 sports halls, 7 activity rooms, an IT suite, a café and library.

The 3,100sqm centre cost £13 million and is designed to support the local community providing a venue for learning and development such as youth work sessions, adult learning classes as well as competition level sports and leisure provisions.

About This Project

Image
We were awarded the contract in September 2019 by Robertson Tayside to provide all Electrical & Mechanical installation including:
  • Lighting
  • Power
  • Data Cabling
  • Plumbing
  • Heating
  • Ventilation
  • Fire & Security
  • Sprinkler System
Competition level lighting
For the facility's sports halls, we installed competition level lighting so they can ensure high standards for lighting levels and uniformity for competitive sports.
Solar PV
Generating clean electricity which is used by the building. Our specialist engineers identified and installed panels for producing long term efficiency and reducing the overall carbon footprint of the building.
Secure Door Access Control
Lenel Access Control System which gives the end user monitoring and control of all doors for the safety of the occupants in the building
Underfloor heating
Underfloor heating provides an energy efficient method of heating, providing an even distribution of heat while preserving wall space in the building.
Air Handling Units
Two large Air Handling Units (AHUs) are positioned on the roof plant deck. The AHUs provide a supply and extract system for the two large games halls. They are controlled by the Building Management System – which is linked to each AHU – ensuring there is always a continuous supply of fresh air and good circulation of air flow throughout the hall.
BIM Modelling
Building Information Modelling enables us to produce an intelligent 3D model of a building, creating a digital description of every aspect of the building, which enables our contractors to efficiently plan, design, construct and manage buildings and infrastructure.

McKenna Group Project Overview:

Project Value: £1.5million
Employment: 15 employees
Apprentices: 4
Adult Trainees: 2

ImageImageImageImageImage

Photography: Copyright by Craig Doogan cpdoogan@gmail.com

Client Testimonial

"Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum."

Customer Name
Position, Company

More Case Studies

Image

Robertson Construction

Abbey View Campus

Image

Angus Council

Maintenance Contract

Image

Balhousie Care Group

Maintenance Contract

Contact Us

Get in touch with our team to discuss your project. We also have dedicated technicians on standby 24/7 ready to help in any emergency.

Make an Enquiry